Competence IQSeparate surface · Control may read · products stay untouched

Auditor door

Sam Okonkwo · Internal auditor. Prove this person was qualified on that date.

Point-in-time proof

On 2025-09-01, Maya Chen was qualified for PMP-ISO-01 on Centrifugal pump, Class B, signed by Jordan Blake, valid 2025-08-01 to 2026-08-01.

Audit trail (synthetic)

Current status: Qualified · Assessor: Jordan Blake

WhenActorAction
2025-07-28T10:00:00ZsystemOpened qualification packet (synthetic)
2025-08-01T14:22:00ZJordan BlakeSigned qualified

Evidence pointers (auditor may follow)

SYNTHETIC Genesis (synthetic pointer)
Isolation order rehearsal · Satisfied
synth://genesis/ns-hp/episode/iso-order-r3
SYNTHETIC Field IQ (synthetic pointer)
Observed isolation on training skid · Satisfied
synth://field-iq/ns-hp/obs/pump-skid-17